fbpx

All our bathroom packages are on display in our Stirling showroom.

  • Any tap, any shower, any tile
  • Great customer support!
  • Hundreds of 5 Star Customer Reviews
  • Showroom open 7 days a week
  • Including lots of customisations and combinations.

Achray bathroom package

Offset shower enclosure with dual drench shower, Modern vanity unit & comfort height WC set. Perfect mixture of wetwall shower panels and tiles.

Dhu bathroom package

8mm toughened safety glass shower enclosure with thermostatic shower, modern vanity unit & WC set. Simply stunning light grey gloss tiles.

What’s included in the Dhu complete bathroom package?

  • 900mm Low Profile Quadrant Stone Shower Tray with 8mm Toughened Safety Glass Enclosure

  • Modern Thermostatic Shower Mixer

  • Modern Basin Mixer Tap with Waste

  • Gloss White Vanity Unit with Ceramic Basin

  • Modern WC Set with soft close toilet seat

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £4,950

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Dhu complete bathroom package includes an 8mm toughened safety glass enclosure with stunning wall and floor tiles.

Below we have included further information for customers purchasing the Dhu Complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Katrine bathroom package

The Katrine complete bathroom package is ultra modern with the walk in shower and stunning brick style tiles. Below we have included further information for customers purchasing the Katrine complete bathroom package.

What’s included in the Achray complete bathroom package?

  • Low Profile Offset Quadrant Stone Shower Tray with 8mm Toughened Safety Glass Enclosure

  • Modern Dual Thermostatic Shower

  • Modern Basin Mixer Tap with Waste

  • Vanity Unit with soft close drawers & Ceramic Basin in choice of colours

  • Modern comfort height WC Set with soft close toilet seat

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £5,950

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Achray complete bathroom package is a stunning bathroom combining wetwall with a lovely gloss grey tile.

Below we have included further information for customers purchasing the Achray complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Etive bathroom package

8mm toughened safety glass shower enclosure with dual drench shower, Modern vanity unit & short projection WC set. Large format gloss white wall tiles with stunning black sparkle floor tiles. To complete the look we’ve added in black sparkle wetwall shower panels and a black sparkle ceiling.

What’s included in the Etive complete bathroom package?

  • 6mm toughened safety glass enclosure with low profile stone shower tray

  • 2 wetwall shower panels with polished chrome extrusions

  • Twin thermostatic dual head deluge shower

  • Modern basin mixer tap with waste

  • Space saving vanity unit with choice of colours

  • Tall storage cupboard

  • Short projection space saver WC set with soft close seat

  • LED mirror and designer heated towel rail with valves

  • Up to 17 M2 of wall and floor tiling. Including feature tiles.

  • Two packs of modern ceiling panels with built in LED lighting

All this for only £5,950

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Etive complete bathroom package includes an 8mm toughened safety glass enclosure with black sparkle ceiling panels and floor tiles.

Below we have included further information for customers purchasing the Etive complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Rannoch bathroom package

If you are replacing a bath with a shower enclosure this is the bay for you. Large Walk in shower enclosure with dual head drench Shower, modern vanity unit & WC set. Large format modern tiles.

What’s included in the Rannoch complete bathroom package?

  • 1700 x 700mm Walk In Shower Enclosure with 8mm Safety Glass Panels

  • Twin Thermostatic Dual Head Deluge Shower

  • Modern Basin Mixer Tap with Waste

  • Modern Vanity Unit with Choice of Colours

  • WC Set with Soft Close Seat

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Including Feature Tiles.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £5,250

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Rannoch complete bathroom package includes is the ideal bathroom package if you are taking a bath out and putting an enclosure in.

Below we have included further information for customers purchasing the Rannoch complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Lomond bathroom package

A simply brilliant example of a standard sized en suite. Large double shower enclosure with twin head combi shower, Modern vanity units & Led mirror above the basin. Large format modern tiles.

What’s included in the Lomond complete bathroom package?

  • 1200 x 800mm Shower Enclosure with an 8mm Safety Glass Shower Door

  • Twin Thermostatic Dual Head Deluge Shower

  • Modern Basin Mixer Tap with Waste

  • Modern Vanity Units with Choice of Colours

  • Back to WC with Soft Close Seat and Concealed Cistern

  • Led Mirror and Designer Heated Towel Rail with Valves

  • Up to 23 M2 of Wall and Floor Tiling. Including Feature Tiles.

  • Two Packs of Modern Ceiling Panels with Built in Led Lighting

All this for only £6,000

Our price comes with a complete fitting service including ripping out and disposing of your current bathroom. Full installation of your new bathroom including all the required trades and materials. No hidden extras.

All our bathroom packages are on display in our Stirling showroom.

The Lomond complete bathroom package includes is the ideal en suite package.

Below we have included further information for customers purchasing the Lomond complete bathroom package.

What is the process of a standard bathroom installation?

This is a question we are often asked.

From visiting us in the showroom, selecting your products, having a survey then selecting a date this part of the process is normally around four weeks.

From then the bathroom installation team turn up on Monday morning around 9am. The first day involves ripping out your existing bathroom and getting the pipes in place for your new bathroom. Day two generally involved repairing or sheeting your walls and floor in preparation for tiling. Days three and four generally see the tiling completed. Day five see’s the installation completed and the bathroom all sealed and tidied up.

We leave you a usable toilet in every night !

This is a general rule of thumb although larger bathrooms can obviously take longer to complete.

Book your FREE no obligation BATHROOM Survey today!

TOP
if( typeof jQuery.fn.loupe != 'undefined' ){ jQuery('.eluid073fcd9d .kjq-loupe').loupe({ 'default_zoom': 150, 'default_size' : 160, 'apply_overlay' : false, 'drop_shadow' : false }); } });